What Should a Good Contractor Estimate Actually Include?

  • Michael Smego
  • 6 minutes ago
  • 9 min read

A good estimate should answer more questions than it creates.

That sounds obvious, but homeowners get handed some pretty wild estimates.

Sometimes it’s a one-page document with a number at the bottom.


Kitchen remodel — $47,500.


Okay.


What exactly am I buying for $47,500?

What materials are included? What isn't included? Are we moving plumbing? Who handles electrical? What kind of cabinets are being priced? Is painting included? Permits? Demo? Disposal?

A price without a clearly defined scope isn't much of an estimate.


It's just a number.


At Smego Construction, there are a handful of things I want a homeowner to have before we ask them to make a serious decision about a project: drawings where appropriate, a clear scope of work, an itemized breakdown of where the money is going, our contractor information and insurance, and an actual contract.

For projects that need more design work, we can also put together renderings as a separate, paid design package.

Here's why each piece matters.


The Price Is Actually the Last Part of the Estimate

Most homeowners understandably go straight to the number.

I get it.

You want to know what the project costs.

But before comparing two prices, make sure you're comparing the same project.

Imagine Contractor A gives you a price of $75,000.

Contractor B gives you $92,000.

Contractor A looks $17,000 cheaper.

Then you find out Contractor B included electrical upgrades, permits, painting, debris removal and a better cabinet allowance, while Contractor A didn't.

Now which one is cheaper?

You don't know.

And that's the problem.


A good estimate defines the project first and prices it second.


Start With a Clear Scope of Work

This is probably the most important part.

The scope of work should explain what the contractor is actually agreeing to do.

Not:

“Remodel bathroom.”

That's useless.

A proper scope should break the project into understandable pieces.

Depending on the job, that might include:

  • Site protection

  • Demolition

  • Disposal

  • Framing

  • Structural work

  • Windows and doors

  • Electrical

  • Plumbing

  • HVAC

  • Insulation

  • Drywall

  • Flooring

  • Cabinetry

  • Countertops

  • Tile

  • Trim

  • Painting

  • Fixtures

  • Permits and inspections

  • Cleanup


Not every project needs every category.

But the homeowner should be able to read the scope and have a pretty good understanding of what happens between demolition day and the day we leave.

That protects both sides.

You know what you're paying for.

I know what I'm responsible for delivering.


The Estimate Should Tell You Where the Money Is Going


This is another thing I think homeowners deserve to see.

If you're spending $100,000 on a remodel, there should be more information than:


Total: $100,000.


Our estimates include an itemized breakdown of where the project dollars are going.

That doesn't necessarily mean you need to see the price of every screw and tube of caulk.

It means the estimate should be broken down enough that you can understand the major cost categories.


For example:


Demolition — $X

Framing — $X

Electrical — $X

Plumbing — $X

Cabinetry — $X

Countertops — $X

Flooring — $X

Painting — $X


Now you can actually look at the project and understand it.

Maybe the cabinets are consuming more of the budget than you expected.

Maybe the electrical scope is larger because the existing system needs work.

Maybe the tile selection is pushing the bathroom over budget.


An itemized estimate gives us something useful to talk about.


A lump-sum number doesn't.


Drawings Matter More as the Project Gets Complicated


For simple work, you may not need an elaborate drawing package.

But as the project becomes more complicated, drawings become increasingly valuable.

If we're changing a kitchen layout, building an addition, moving walls or significantly altering a space, I want everybody working from the same basic plan.

Where does the wall go?

How big is the opening?

Where is the island?

Where are the cabinets?

How does the new space connect to the old one?

Trying to answer those questions verbally during construction is how mistakes happen.

Drawings turn “I thought you meant…” into something everybody can actually look at.

They also help subcontractors price their portions of the work more accurately.

The electrician sees the layout.

The plumber understands where fixtures are moving.

The cabinet supplier has dimensions.

The framer understands the new walls and openings.

The more complicated the project, the more valuable that coordination becomes.


Renderings Are Different From Drawings

This distinction is worth making.

A drawing helps explain how the project is laid out and built.

A rendering helps you understand what the finished project could look like.

For certain projects, we offer renderings as a separate paid design package.

That's intentional.

Producing useful renderings takes additional design time. You're no longer just estimating construction. You're working through layouts, finishes, proportions and visual decisions before construction begins.

For the right project, that can be incredibly useful.

Instead of trying to imagine how navy cabinets, white quartz, a new island and an opened wall will look together, you can actually see a representation of the space.

That gives you an opportunity to say:

“I don't like that.”

Before we build it.

That's a much cheaper time to change your mind.


A Good Estimate Should Make Allowances Clear

This is where a lot of budgets get sideways.

Let's say the estimate includes a bathroom vanity.

Okay.

Which vanity?

A $600 vanity?

A $1,500 vanity?

A $4,000 custom vanity?

Those are all technically “a vanity.”

If the exact product hasn't been selected yet, the estimate should make the allowance clear.

The same applies to things like:

  • Tile

  • Flooring

  • Plumbing fixtures

  • Lighting

  • Cabinets

  • Countertops

  • Hardware

  • Appliances


Allowances aren't necessarily bad.

Sometimes you simply aren't ready to select every finish when the estimate is prepared.


The problem is an allowance you didn't know was an allowance.

If your estimate assumes $4 per square foot for tile and you later choose $12 tile, the project didn't mysteriously become more expensive.

Your selection changed.

A good estimate makes that distinction easier to understand.


It Should Also Tell You What Isn't Included

This can be just as important as what is included.

Maybe appliances are owner-supplied.

Maybe landscaping after an addition isn't included.

Maybe hazardous-material remediation requires separate evaluation.

Maybe furniture moving isn't part of the scope.

Maybe a particular fixture hasn't been selected.

Whatever the exclusions are, I'd rather put them on paper than discover them halfway through construction.

A good estimate shouldn't rely on assumptions.

Because your assumption and my assumption may be completely different.


You Should Know Who You're Hiring

Before signing a construction contract, you should know that the contractor is actually operating as a legitimate business.

With our proposals, we provide our contractor license information and insurance information.

That's not decoration at the bottom of the estimate.

It's part of your due diligence.

In Pennsylvania, home-improvement contractors subject to the Home Improvement Consumer Protection Act generally must register with the Attorney General, and covered contracts have specific requirements.

Homeowners should verify the contractor they're considering and understand who they're entering into an agreement with.

You're not just buying cabinets and lumber. You're hiring the company responsible for managing the project.

That matters.


Insurance Shouldn't Be a Mystery

Ask about insurance.

Don't feel awkward about it.

If a contractor is working in your home, you have every right to understand whether the company carries appropriate insurance for the work it performs.

We include our insurance information with our proposal package because I don't think homeowners should have to chase us down for basic business credentials.

And I would be cautious if a contractor gets defensive because you ask.

Legitimate questions shouldn't make a legitimate contractor uncomfortable.


Then There Should Be an Actual Contract

An estimate tells you what the project is expected to cost.

The contract establishes the agreement.

Those are not the same thing.

For covered Pennsylvania home-improvement work, state law requires written contracts and specifies information that must be included. Depending on the project and applicable law, that can include contractor information, project dates, description of the work, total price, payment terms and other required provisions.

This is another reason I don't like handshake agreements for substantial remodeling work.

Everybody may be completely honest on day one.

Then three months later, nobody remembers the conversation exactly the same way.

Put the agreement in writing while everybody agrees on what the agreement is.


Payment Terms Should Be Clear Before Work Starts

You should know how payments work.

Not:

“We'll figure it out as we go.”

The contract should make the payment structure understandable.

When is the initial payment due?

Are there progress payments?

What milestones trigger them?

When is the final balance due?

This is especially important on larger projects because construction money moves throughout the job.

Materials are ordered.

Subcontractors perform work.

Project stages are completed.

The payment structure should match the agreement instead of becoming a surprise every few weeks.


Changes Need a Process Too

Almost every substantial remodeling project has the potential for changes.

Sometimes you change your mind.

Sometimes we open a wall and discover something nobody could reasonably see beforehand.

Sometimes a product is discontinued.

Sometimes the project scope grows.

The question isn't whether changes can happen.

The question is what happens when they do.

There should be a clear process for documenting changes to the scope and price.

If you decide halfway through the project that you want to add recessed lighting throughout the room, that's fine.

But it shouldn't become:

“I thought that was included.”

“No, it wasn't.”

“Well, nobody told me it cost extra.”

Put changes in writing.

Price them.

Approve them.

Then proceed.


Be Careful Comparing Estimates by the Bottom Line

This is probably the biggest takeaway.


Suppose you have three estimates:

Contractor A — $68,000

Contractor B — $79,000

Contractor C — $91,000


It is incredibly tempting to think you have three prices for the same thing.


You may have three prices for three completely different projects.


One contractor included permits.

One didn't.

One included painting.

One didn't.

One priced custom cabinets.

Another carried an allowance for stock cabinets.

One included electrical upgrades.

Another wrote “electrical by owner.”

One included drawings.

Another plans to figure out the layout after demolition.

The dollar amount only becomes useful after you understand the scope behind it.

We have another article specifically about why contractor bids can be so far apart, and this is a big part of the reason.


What I Would Want to See Before Signing


If I were hiring somebody for a substantial remodeling project, here's what I'd want in front of me:

  1. A clear description of the project

  2. A detailed scope of work

  3. Drawings where the project needs them

  4. Clearly identified allowances

  5. Clearly identified exclusions

  6. An itemized breakdown of major project costs

  7. Contractor registration/license information as applicable

  8. Insurance information

  9. Permit responsibility

  10. Payment terms

  11. A process for changes

  12. A written contract

  13. Renderings, if I decided the project warranted a separate design package

I don't need a 70-page binder for a small bathroom.

But if I'm about to hand somebody a substantial amount of money to tear apart my house, I want more than a number written on a sheet of paper.


A Good Estimate Should Reduce Surprises

No estimate can predict everything.

Especially in remodeling.

We open existing walls.

We work on houses that may have been altered three or four times over the last hundred years.

There are things nobody can reasonably know until construction begins.

Our older-home buying checklist talks about this problem from the homeowner's side, and it's one reason older-home remodeling requires some flexibility.

But uncertainty is not an excuse for a vague estimate.

It's the opposite.

The things we can define should be defined clearly so we have room to deal intelligently with the things we can't predict.

That's what I think a good construction estimate should do.

Not impress you with a fancy cover page.

Not bury you in construction terminology.

Not give you the lowest possible number so you'll sign.

It should help you understand:

What are we building?

What's included?

What's not included?

Where is the money going?

What decisions still need to be made?

Who am I hiring?

And what exactly are we agreeing to?

If you can answer those questions before construction begins, you're starting the project from a much better place.

And if all you have is “Remodel kitchen — $47,500,” I would have a few more questions before signing anything.


FAQ


How detailed should a contractor estimate be?

The detail should match the size and complexity of the project. For substantial remodeling, you should be able to understand the scope, major cost categories, allowances, exclusions and responsibilities rather than receiving only a lump-sum price.


Should a contractor provide an itemized estimate?

I think homeowners should be able to see where the major dollars are going. That doesn't require pricing every individual screw, but major categories such as framing, electrical, plumbing, cabinetry and finishes should be understandable.


Should drawings be included with a remodeling estimate?

For projects involving layout changes, additions or substantial alterations, drawings can help define what is actually being priced. Simpler projects may not require the same level of documentation.


Are 3D renderings normally included in a contractor estimate?

Not necessarily. At Smego Construction, renderings are available as a separate paid design package because creating them involves additional design work beyond preparing the construction estimate.


Why can two contractor estimates be so far apart?

Often because the scopes aren't actually the same. Materials, allowances, subcontractor work, permits, exclusions, design work and the amount of work included can vary substantially. Compare the scope before comparing the bottom-line price.


What should I ask for before signing a remodeling contract?

At minimum, understand the scope, price, allowances, exclusions, contractor credentials, insurance, payment terms, permit responsibilities and how changes will be handled. For covered Pennsylvania home-improvement projects, make sure the written contract complies with applicable state requirements.